This week's progress...

We are now weather-proofed with all of the paper on the outside. All of the tile is stacked evenly on the roof. Drywall stacks are starting to appear inside, but that's just a precursor to next week's work. The inside of the winery (sorry no pictures) has some changes too. All of the walls that touch the new tasting room have been drywalled, the window between the two has been cut out and the door hole is ready to punch through to the new building. Did I mention that the fence is gone from the parking lot? We're on schedule and getting excited for the holidays possibly in our new building.